link7410 link7411 link7412 link7413 link7414 link7415 link7416 link7417 link7418 link7419 link7420 link7421 link7422 link7423 link7424 link7425 link7426 link7427 link7428 link7429 link7430 link7431 link7432 link7433 link7434 link7435 link7436 link7437 link7438 link7439 link7440 link7441 link7442 link7443 link7444 link7445 link7446 link7447 link7448 link7449 link7450 link7451 link7452 link7453 link7454 link7455 link7456 link7457 link7458 link7459 link7460 link7461 link7462 link7463 link7464 link7465 link7466 link7467 link7468 link7469 link7470 link7471 link7472 link7473 link7474 link7475 link7476 link7477 link7478 link7479 link7480 link7481 link7482 link7483 link7484 link7485 link7486 link7487 link7488 link7489 link7490 link7491 link7492 link7493 link7494 link7495 link7496 link7497 link7498 link7499 link7500 link7501 link7502 link7503 link7504 link7505 link7506 link7507 link7508 link7509 link7510 link7511 link7512 link7513 link7514 link7515 link7516 link7517 link7518 link7519 link7520 link7521 link7522 link7523 link7524 link7525 link7526 link7527 link7528 link7529 link7530 link7531 link7532 link7533 link7534 link7535 link7536 link7537 link7538 link7539
Русская версия

Site search:
ENGLISH DOCS FOR THIS DATE- Excerpts from P641109,26 For Staff Hats (DIV1.DEP3.GEN-REG, 0.STAFF-ORIENT) - P650329
- Fast Flow System (DIV1.DEP3.OIC, 0.DUTIES) - P650329-2
- Routing Despatches (DIV1.DEP2.COM-SYS) - P650329

RUSSIAN DOCS FOR THIS DATE- Как Направлять Послания (ц) - И650329-1
- Направление Посланий - И650329-1
- Ориентация Направление Посланий - И650329-1
- Ориентирование Направление Посланий - И650329-1
- Потоки и Расширение Система Быстрого Потока (Серия ОСНОВЫ АДМИНА) (ц) - И650329-2
- Правила для Персонала (ц) - И650329-3
- Шляпы Персонала Ориентирование Направление Посланий - И650329-1
CONTENTS ADMINISTRATION FLOWS AND EXPANSION
THE FAST FLOW SYSTEM

HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO POLICY LETTER OF 29 MARCH 1965
Issue II
Gen Non-Remimeo

ADMINISTRATION FLOWS AND EXPANSION
THE FAST FLOW SYSTEM

We have introduced many new principles in administration in recent policy letters. Here is one which if left out would cause mystery.

This is the principle of traffic flows we now use. It is called the FAST FLOW SYSTEM OF MANAGEMENT.

A being controlling a traffic or activity flow should let the flow run until it is to be reinforced or indicates a turbulence will occur and only then inspects the part of the flow that is to be reinforced or is becoming enturbulated and inspects and acts on only that one flow.

This principle would operate on a committee of 3 in this fashion: the committee does not act as a body. Each member acts individually in three spheres of influence (three types of flow). There is no committee (collective) action until one of the three members wants concurrence from the other two on greatly reinforcing a flow or until the other two, by observation, see the third is going adrift. Only in these cases does the committee act as a Committee. In other words all 3 members go about their work independently until there is a change in one of their three spheres and then they act. Otherwise the flows of orders and actions are independent. Not doing it like this is why Committees have gotten the reputation of being unable and a waste of time.

To do this one, of course, needs another principle: that of Indicators.

An Indicator is something that signals an approaching change rather than finding the change is already present and confirmed.

We get this from auditing. An auditor audits so long as things go evenly. He knows when they will begin to deteriorate or change by an Indicator. He acts on seeing the indicator. He doesn't wait until the collapse or total change of the pc occurs and then look it over and act. The pc could be run into the ground or a good process that was bettering the case could be neglected if an auditor could not PREDICT from indicators how it was going before it was gone.

In supervising a number of sections or departments, it would work this way:

The person in charge does not examine every action or decision on the lines. If all despatches of all the activities went through his or her one pair of hands the volume would be too great and would jam. The executive's "plate" would be too full and this would halt any expansion of the activities as the executive would feel overworked, yet in actual fact would be getting nothing much done. The flows which needed watching would be buried in a huge volume of flows that did not need watching.

Instead, the principle of flows tells us that the executive should have statistical INDICATORS such as O.I.C. charts on every part of the activity each week and should act only on the basis of the charts' behaviors.

If a chart went down the Executive would not wait for that area to collapse before inspecting it. At a dip point the executive should go over all the plans and traffic and despatches of the area dipping down and unearth the real reason why it did dip. If the matter needs minor remedy, it should be corrected. If then the graph still dipped down, the executive would not only be advised of it by the OIC Indicators but would know, having inspected earlier, what had to be done on a more drastic scale to get the graph going up again.

The OIC system must be used and all data plotted and circulated to the Executives in an org before this system will work.

If the OIC system is put into effect fully the executive can then (and only then) let go the comm lines and let the traffic flow.

He then only needs to:

1. Keep alert for and correct Dev-T (off-line, off-policy, off-origin and non-compliance);

2. Keep an eye on the weekly OIC charts;

3. Find from OIC the upward trends and inspect and find out what's working so well it can be reported;

4. Be alert to any down dip and inspect the activity itself and correct the matter; and

5. Spend most of his time getting his own job done (since executives do have jobs besides supervision).

The one thing he mustn't do is "get reasonable" about dips or zooms and not act to really check the decline or to reinforce the rise:

(a) Thinking one does know when he has not gotten it inspected closely;

(b) Not believing the graph and Indicators; and

(c) Not acting, are the fatal errors.

Doing (1) to (5) tells us who's an executive and doing (a), (b) and (c) tells us who shouldn't be an executive.

If this system is in effect the org can't help but boom.

We will call this the FAST FLOW SYSTEM OF MANAGEMENT.

It is a very precise art. It's like auditing. One predicts the slumps and reinforces the tendency to boom.

It can't miss. If it's done completely.

L. RON HUBBARD LRH:ml.rd

[LRH NOTE: Study this. Shows why of OIC.]