link3380 link3381 link3382 link3383 link3384 link3385 link3386 link3387 link3388 link3389 link3390 link3391 link3392 link3393 link3394 link3395 link3396 link3397 link3398 link3399 link3400 link3401 link3402 link3403 link3404 link3405 link3406 link3407 link3408 link3409 link3410 link3411 link3412 link3413 link3414 link3415 link3416 link3417 link3418 link3419 link3420 link3421 link3422 link3423 link3424 link3425 link3426 link3427 link3428 link3429 link3430 link3431 link3432 link3433 link3434 link3435 link3436 link3437 link3438 link3439 link3440 link3441 link3442 link3443 link3444 link3445 link3446 link3447 link3448 link3449 link3450 link3451 link3452 link3453 link3454 link3455 link3456 link3457 link3458 link3459 link3460 link3461 link3462 link3463 link3464 link3465 link3466 link3467 link3468 link3469 link3470 link3471 link3472 link3473 link3474 link3475 link3476 link3477 link3478 link3479 link3480 link3481 link3482 link3483 link3484 link3485 link3486 link3487 link3488 link3489 link3490 link3491 link3492 link3493 link3494 link3495 link3496 link3497 link3498 link3499 link3500 link3501 link3502 link3503 link3504 link3505 link3506 link3507 link3508 link3509
Русская версия

Site search:
ENGLISH DOCS FOR THIS DATE- Project Clear Check Sheet - B571113

CONTENTS PROJECT CLEAR CHECK SHEET INFORMATION SHEET ON PROJECT CLEAR
HUBBARD COMMUNICATIONS OFFICE
HCO BULLETIN OF 13 NOVEMBER 1957

PROJECT CLEAR CHECK SHEET

USE A CHECK IF PROCESS IS RUN, USE AN X IF PROCESS IS CONSIDERED FLAT.

Note: This sheet does not replace regular report sheets in HGC but must be included.

INFORMATION SHEET ON PROJECT CLEAR

It is expected that the processes scheduled for project clear be run more or less in the following order.

CCH 0 at the beginning of each session. If pc falters on one or another point, stress that point until cleared up.

CCH 1, 2, 3 and 4 to be run as follows. If 1 produces no reaction go to 2, if 2 produces no reaction go to 3, if 3 produces an action flatten it a bit and go to 4. If 4 produces an action or no action either flatten or go quickly to 1, etc, until these steps have each one been unflattened and flattened again.

Tr. 10 is used liberally as a bridge process and to start and end sessions. If it develops a somatic, auditor should treat it as a process and flatten it and then go right on using it. Main use is at session end.

RECALL SOMETHING REALLY REAL TO YOU is run to test recalls. It is a very effective process in itself. In fact all the three questions of ARC Straight Wire can be run if pc is found pretty bad on this. But it is intended to be used simply to groove the pc and to keep a cataclysm from occurring if the pc can’t run recall processes. If he has a hard time, flatten ARC Straight Wire. Otherwise, run for minutes only.

RECALL AN UNWANTED OBJECT and RECALL A MOMENT OF LOSS are a pair. If one is used, then the other must be used exactly the same length of time in the same session. They are alternate processes where one is run a half hour then the other is run a half hour. These two are the chief processes of Operation Clear so give them lots of concentration and time.

TRIO is run as a step between recall processes. If one session is run on recall processes the next is run on TRIO. There is Control Trio and Trio. It is up to the auditor which is used. But use all three commands of either in any proportion that seems right to the auditor. Run lots of Trio even though both recall processes are havingness processes.

RECALL AN EXPECTED COMMUNICATION and RECALL A COMPLETED

COMMUNICATION are interesting processes. Communication as-ises havingness. Thus this is a reverse process which, by dropping the pc’s level of concentration on past persons and activities thus gives him the havingness of those areas of the track. These processes may or may not be vital to Project Clear as they are released ahead of long experiment and use.

RISING SCALE PROCESSING is run when the pc can change ideas. He must be up to lots of cognitions before this is run. It is run from the Chart of Attitudes as given in Creation of Human Ability.

ADJUSTING ANCHOR POINTS is done almost at project end. This is a delicate auditing job and additional material will be released upon it.

SHORT SPOTTING and VALENCE SPLITTING are fitted in at the auditor’s discretion. SHORT spotting is done by indicating objects close up to pc and making him repeatedly notice his psychosomatic area. Valence splitting may not even be necessary if the above auditing steps are well done. Also, it may be that psychosomatic difficulties will not need further attention than earlier processes on this sheet.

PROBLEMS OF COMPARABLE MAGNITUDE are here done with MOCK UP SOMETHING WORSE THAN PSYCHOSOMATIC CONDITION. UNWANTED FUTURES may also be fitted in anywhere.

L. RON HUBBARD