Русская версия

Site search:
ENGLISH DOCS FOR THIS DATE- Release, Rehabilitation of - BTB681206

CONTENTS Release, Rehabilitation of Example: Rehabbing of Grade 0
BOARD TECHNICAL BULLETIN
6 DECEMBER 1968
Reissued 5 July 1974 as BTB
Cancels
HCO Bulletin of 6 December 1968 Same Title
Remimeo Class III and above

Release, Rehabilitation of

With the power of Standard Tech as it is today the rehabilitation of former states of release has become a very simple action.

It cannot be overstressed the importance of the Auditor having perfect TRs, perfect Comm Cycle, and precise meter handling.

The procedure is simple. The Auditor finds out from the pc what level process or activity the pc has been released on in life or auditing, finds out how many times and gets the F/N. There is no listing.

Example: Rehabbing of Grade 0

Auditor: "What communication process have you been released on?"

PC: "0-0. "

Auditor: "Fine. How many times were you released on 0-0?"

PC: "Oh, about 16 times!" (F/N-GIs)

Auditor: "Thank you. Your needle is floating. "

If the pc doesn't know "How many times" the Auditor can then help the pc on the meter by counting. (It can go to billions on some activities.)

It's that simple! That's all there is to rehabbing any activity or process the pc has been released on. And if you don't get a free needle then the pc is being audited over a PTP, ARC Break, Missed W/H or the Auditor's TRs, Comm Cycle or meter reading is out or the process was never flattened.

Alright so make sure your Comm Cycle, TRs and meter handling are perfect and you and the pc will win every time.

And keep Standard Tech simple.

Tech & Qual Aide
Reissued as BTB by Flag Mission 1234
I/C: CPO Andrea Lewis 2nd: Molly Harlow
Authorized by AVU for the BOARDS OF DIRECTORS of the CHURCHES OF SCIENTOLOGY
BDCS:SW:AL:MH:PQ:mh.cden.jh