Русская версия

Site search:
ENGLISH DOCS FOR THIS DATE- Precision Dianetics - BTB710308-1R74

CONTENTS Precision Dianetics
BOARD TECHNICAL BULLETIN
8 MARCH 1971R
Issue I R
Revised & Reissued 10 June 1974 as BTB
Cancels
HCO Bulletin of 8 March 1971 Issue II
Same Title
Remimeo Dn Checksheet Ext Int Checksheet HGC Auditors

Precision Dianetics

Dianetics is Precision run.

"There is no permissive R3R. Skipping R3R commands or not making the PC do each one is giving you keyouts like recalls and self-auditing PCs. The PC is made to execute each step by order even if he's done it. PCs will come back under auditor control!" LRH

A "fast" PC is never too fast for a precision auditor. There is a difference between a fast PC and a PC whom the auditor is not controlling.

R3R is run muzzled. Only the commands as given in BTB 6 May 1969R Issue IR, revised 10 June 1974. "Routine 3R Revised Engram Running By Chains" are used. The full extent of TR 0 to 4 is used. No step is skipped ever.

R3R is precise and exact and never varied whether run by a Dianetic Auditor with no other Classification or by a Dianetic Auditor who is also a highly classed Scientology Auditor.

Training &Services Aide
Revised & reissued as BTB
by Flag Mission 1234
I/C: CPO Andrea Lewis
2nd: Molly Harlow
Authorized by AVU for the BOARDS OF DIRECTORS of the CHURCHES OF SCIENTOLOGY
BDCS:SW:AL:MH:JR:mh