Русская версия

Site search:
ENGLISH DOCS FOR THIS DATE- Forcing a PC - B690511-2
- Meter Trim Check (TECH, QUAL) - B690511
- Meter Trim Check (TECH, QUAL) - B690511R78

RUSSIAN DOCS FOR THIS DATE- Принуждение ПК - Б690511-2r69
- Проверка Отстройки Е-метра - Б690511
CONTENTS METER TRIM CHECK
HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO BULLETIN OF 11 MAY 1969
Remimeo All Orgs Exec Secs Tech Sec Qual Sec All Tech Hats All Qual Hats Dianetic Course (Tech Div) (Qual Div)
(Replaces HCO B of 27 July 1966, same name)

METER TRIM CHECK

E-Meters can go out of trim during a session because of temperature changes.

Thus even if the meter is properly calibrated and reads at 2.0 with a 5,000 ohm resistor across the leads and 3.0 with 12,500 ohms, by the end of the session a pc can be apparently reading below 2.0 because the meter is off trim.

The following meter procedure is therefore to be followed AT THE END OF EACH SESSION (AFTER GIVING “THAT’S IT”):

1. DON’T MOVE THE TRIM KNOB

2. PULL OUT THE JACK PLUG

3. MOVE THE TA UNTIL THE NEEDLE IS ON “SET” AT THE SENSITIVITY YOU WERE USING IN THE SESSION

4. RECORD THE TA POSITION AT THE BOTTOM OF THE AUDITOR’S REPORT FORM AS: “TRIM CHECK — TA = …”

5. IF YOUR METER IS KNOWN TO BE OUT OF CALIBRATION (as in Para 2 above) RECORD ALSO: “Calibration error — on meter = 2.0 actual” at the bottom of the form.

L. RON HUBBARD LRH:lb-r.cs.an.ei.rd